← All notes
Field notes · Learning culture

Post-mortems as a habit, not a ceremony

Most post-mortems happen when something goes wrong. The teams that learn fastest do them after wins too. Why a steady, blameless cadence beats the failure-triggered meeting.

jul 2026

Most teams reach for a post-mortem only when something has broken. A release failed. A launch missed the date. A customer escalated. The meeting gets called, the slide deck gets built, and the team spends an hour walking through what went wrong before going back to the work.

That version of the post-mortem is a ceremony. It signals failure. It produces a small set of lessons-learned bullets that may or may not change anything. And it teaches the team to associate the meeting with discomfort, which makes the next post-mortem harder to convene than the last.

The most effective version is different. It's a habit, not a ceremony. It happens regularly, not exceptionally. And it happens after wins as often as after losses.

Ceremony versus habitTwo timelines. The ceremony fires only on rare failures with long silences between. The habit fires on a regular cadence after every delivery cycle, covering both wins and losses.AS A CEREMONYFires only when something breaks. Long silences between.failurefailurefailuresilenceAS A HABITFires every delivery cycle. Wins and losses, equal weight.every cycle · green = win · amber = loss
The regularity is what makes the conversation routine instead of charged.

Why the wins matter more

Annie Duke names a thinking error she calls resulting: judging the quality of a decision by the quality of its outcome. A bad decision can lead to a good result by sheer luck. A good decision can lead to a bad result the same way. If you only review the outcomes you didn't like, you systematically miss the good outcomes that came from bad reasoning. And bad reasoning, unexamined, repeats.

Resulting: decision quality versus outcomeA two-by-two grid. Columns are outcome (win or loss); rows are decision quality (good or bad reasoning). Failure-only post-mortems cover only the loss column, missing the lucky win that came from bad reasoning — where the leverage hides.OUTCOMEDECISION QUALITYWinLossGoodreasoningBadreasoningDeserved winSkill, not luck.Worth repeating on purpose.Unlucky lossSound call, bad break.Don't change the process.Lucky winGood result, bad reasoning.Never examined → repeats.← the leverage hides hereDeserved lossBad call, bad result.The one teams usually review.All a failure-only post-mortem ever sees
Review only the losses and the lucky win — bad reasoning rewarded by chance — never gets caught.

This is why the wins are where leverage hides. A successful launch can mask the fact that three teams duplicated effort, that the timeline only worked because someone burned out, or that the launch caught a tailwind unrelated to the team's choices. None of that surfaces in the celebration. All of it shapes the next launch.

A post-mortem after a win asks: what worked, and why? Then the harder version: would we make the same choices again with what we now know?

Four traditions worth borrowing from

The principle isn't new. It has been worked out independently in several high-stakes fields, each of which arrived in roughly the same place.

In software, Norm Kerth formalised the project retrospective in 2001 and named what he called the Prime Directive: the assumption, going into the meeting, that everyone involved did the best work they could with what they had at the time. That assumption is what makes honest discussion possible.

In site reliability engineering, Google's SRE practice popularised the blameless post-mortem: write it to understand the system, not to assign individual fault. The aim is to make the system more reliable by understanding how the failure became possible, not to find the person whose mistake it was.

In medicine, the surgical Morbidity and Mortality conference has existed for over a century. At its best, it's the cultural backbone of safer surgery. At its worst, the unspoken curriculum has been described as abuse, berate, and chastise. The modern version learned to focus on systems and patterns instead, in part thanks to writers like Atul Gawande, who documented the older culture in Complications.

In decision theory, Duke's Thinking in Bets makes the case that separating decisions from outcomes is not just a learning practice. It's a discipline of thought.

Four professions, one principleFour fields — software, site reliability engineering, medicine, and decision theory — converge on the same principle: judge the process not just the result, look at the system not the person, and make honest discussion possible.SOFTWAREKerth'sPrime DirectiveEveryone did their bestwith what they knew.SREBlamelesspost-mortemUnderstand the system,not the fault.MEDICINEThe M&MconferenceSystems and patternsover blame.DECISION THEORYDuke'sThinking in BetsSeparate the decisionfrom the outcome.THE SAME PRINCIPLEJudge the process, not just the result. Look at the system, not the person.Then create the conditions in which honest discussion is actually possible.
The same principle, four different professions.

What a good post-mortem actually looks like

There is no single template. The shape varies by team, cadence, and context. But the strong versions share a few features.

  • They happen on a schedule, not on demand. A regular cadence after each delivery cycle is more useful than an annual ceremony triggered by the big failure. The regularity is what makes the conversation routine instead of charged.
  • They cover wins and losses with equal weight. The team that only meets when something has broken is teaching itself that the meeting is a punishment.
  • They focus on the system, not the people. The question is never who did this? It's how did this become possible? That shift unlocks honest contribution.
  • They produce actions, not just observations. Every recurring observation without a follow-up action erodes the team's confidence that the post-mortem is real.
  • They are documented for the next person. The decision log lives here. Pattern recognition happens over time, across many post-mortems, not in any single one.

Because the artefacts do the remembering, a steady cadence quietly becomes one of the governance surfaces a PM holds — see the PM as governance system. And the cadence reads differently depending on the kind of work: a migration's post-mortem asks did we deliver as planned?, while an exploratory workstream's asks what did we learn, and was the bet sound? (more in running two workstreams as one PM).

The product manager's role

You are not the one with the solutions. That's not the PM's job in a post-mortem.

Your job is to frame the problem clearly, bring the right people into the room, and protect the discussion from defensiveness so the actual reasoning surfaces. The team supplies the diagnosis and the fix. You hold the space in which both can happen. When the follow-up actions cross team boundaries, the ownership matrix decides who actually carries each one — see multi-team coordination.

This is also why post-mortems are an underused PM lever. They are one of the cheapest ways to build a learning culture, and one of the most reliable ways to make a team's improvement compound over time.

Common mistakes
  • Only doing them after failures. Trains the team to associate the meeting with blame. The wins are where the leverage hides.
  • Calling them when you need them, not on a schedule. The schedule is what makes the meeting safe. Without it, every post-mortem becomes a referendum.
  • Looking for who, not how. The system view produces lasting fixes. The personal view produces defensiveness and silence.
  • Treating the output as a list, not a system. Observations without owners and deadlines don't improve anything.
  • Pretending the PM has the answers. You don't. Your job is to make sure the people who do can speak honestly.